Hi , Cid ,
The file for Maria Guerrero was review for reviewedreviewed for initial processing, and is missing required documentation,. It is not ready to be sent to the Underwriting Cabinet.
NOI will be created after 10 days of the initial Loanloan application 07/08/2017(07/08/2017).
This isThese are the item needitems needed:
•
• 1003 Loan application
pleasePlease be advised that a copy of the NOI letter iswas bee sent to the borrower on 07/18/2017,. If documentdocuments are not Receivedreceived, this file will be cancelled .
Note: If you have already requested and received this document, please send this to me so that I can continue with the Processing Reviewprocessing review.
The text above was approved for publishing by the original author.
Previous
     
Next
Просто зайдите в свой ящик электронной почты, перейдите по ссылке подтверждения, которую мы Вам выслали, и Вы получите исправленный текст. Если Вы хотите проверить больше электронных писем, Вы можете просто:
Или